Monday, July 3, 2006

reno update

Heres a quick update (i always appreciate nudges, thanks shell!) on how my renos are going.
looking into the bedroom

I've shifted focus to the bedroom/2ndroom of the unit. This weekend was highly productive. The wall's framing is complete, its electrical (once doublechecked since i had to move the outlets out) is all done, and the ceiling is strapped, insulated, and (mostly) ready for drywall. I've finally cleared out the majority of shit from the room and its relatively clean. I'm hoping this weekend i can get some folks over to help me throw the gypsum up on the ceiling and the walls (most of the walls).

looking into the bathroom


The one wall that i won't, is the bathroom. The bathroom is tricky cause i want to do the floors, new sink, and the tub. First thing will be to throw out the old sink, decommision and move the toilet out, screw the floor (literally), and lay tile. Then grout, then probably some sealant. Then the toilet can go back in and i can pee again.... but there's gonna be some time delay in there. If i'm uberfast, i can get all that done in a long day. But it will be tough. O, i forgot, the drywall really needs to go up first, and if theres a crease behind the toilet, it should be taped and compounded first. Not to mentionthe toilet needs to be moved a few inches - i haven't figured out how i'm gonna do that yet. But it must be done!
the exterior wall

The tile has all been bought. I'm doing this dark brownish/blackish tile on the floor, dark grout. The tub will be slick white on white with a boobhigh strip of these kick ass red glass tiles. It should be quite striking, hopefully. But thats another issue - not having a shower, no doubt for a few days (epoxy grout == hard to work with), but it needs to be done. Right now the wall with the shower spout is the only remaining chunk of the old dividing wall, the water coming out of the pipe hanging on a thread. But its worked so far.

Ok, thats it. Good progress, but so much left to do. Let me do a quick run down:
- added floor joists above
- rebuilt wall between bath and bedroom
- removed and rerouted existing electrical
- removed old redundant beam
- removed ceiling, drywall and wood
- removed all drywall, wood from one wall
- removed crap flooring
- added new beam for 1 existing and one new joist
- added new framing to exterior wall
- removed many, many nails
- insulated exterior wall
- ran 2 new curcuits, 3 plugs, 2 fixtures, 3 switches
- installed bath fan
- strapped ceiling
- added some ceiling sound insulation
- sweated a lot, fretted a lot, and had a lot of smoke breaks, the best of which include ice cream

But its been fun, and its good cause soon i'll actually have made "real progress"!!! Then to pick some flooring for the little hall and bedroom. Soon, soon, soon.

And hey, thanks for reading this far!!!! I'm going to sleep now.